In SP1 – System integration and optimisation the project will take advantage of the work
performed in ENCAP and DYNAMIS using the common guidelines and boundary
conditions reference documents that have been developed. The nature of the
work in SP1 does not lend itself easily towards strict performance targets
so a more qualitative description is provided. The following
performance/research indicators are defined:
-
Development of new cycle
simulation models that incorporates the dynamics and control system of
integrated plants including novel unit operation components.
-
Improved cost estimation
of novel component technologies, like membrane and sorbents, today and
in the 2015 – 2020 time period.
-
Improve cost estimation
taking into account uncertainty and availability aspects.
-
Risk and safety analysis
of novel components, including the evaluation of the hydrogen-rich fuel
delivery system for an ZEIGCC.
-
Establishment of an
European Benchmarking Task Force (EBTF) among the 3 projects DECARBit,
CESAR and CAESAR to provide a best practice guideline document – thus
securing consistency of such work in the future.
|